Maa Gayatri Steel 250 KW

Limboda Gari, Indore, Madhya Pradesh, India | 250 kW

A large-scale 250 KW industrial solar installation for Maa Gayatri Steel in Indore, Madhya Pradesh. This industrial solar project features high-efficiency Luminous Topcon solar panels, Luminous inverters with ACDB/DCDB and wiring, and robust JSW mounting structures. The project includes advanced safety features like ESE Type Lightning Arrestor and FRP walkways for maintenance access.

Maa Gayatri Steel 250 KW - Hero image
Industrial
Featured

Project Gallery

Maa Gayatri Steel 250 KW - Image 1
Maa Gayatri Steel 250 KW - Image 2
Maa Gayatri Steel 250 KW - Image 3
Maa Gayatri Steel 250 KW - Image 4
Maa Gayatri Steel 250 KW - Image 5
Maa Gayatri Steel 250 KW - Image 6
Maa Gayatri Steel 250 KW - Image 7

Project Video

Project Specifications

Panel Company:Luminous Topcon
Inverter:Luminous Inverter with ACDB/DCDB and wiring
Structure:JSW Structure
Capacity:250 KW
Location:Limboda Gari, Indore, Madhya Pradesh, India
Special Features:FRP Walkway, ESE Type Lightning Arrestor

Project Details

A large-scale 250 KW industrial solar installation for Maa Gayatri Steel in Indore, Madhya Pradesh. This industrial solar project features high-efficiency Luminous Topcon solar panels, Luminous inverters with ACDB/DCDB and wiring, and robust JSW mounting structures. The project includes advanced safety features like ESE Type Lightning Arrestor and FRP walkways for maintenance access.

Challenges

The industrial facility required a high-capacity solar system that could meet substantial energy demands while ensuring minimal disruption to steel manufacturing operations. The project needed to integrate with existing industrial electrical infrastructure and comply with strict industrial safety standards.

Solutions

We implemented a comprehensive 250 KW solar system using premium Luminous Topcon panels for maximum efficiency, Luminous inverters with integrated ACDB/DCDB systems for reliable power conversion, and JSW structures for industrial-grade durability. Additionally, we installed ESE Type Lightning Arrestor for enhanced safety and FRP walkways for safe maintenance access.

Results

  • 250 kW system generating approximately 350,000 kWh annually
  • Significant reduction in industrial electricity costs
  • Carbon offset of approximately 245 tons per year
  • Enhanced industrial facility sustainability profile
  • ESE Type Lightning Arrestor for enhanced safety
  • FRP walkways for safe maintenance access
  • Advanced ACDB/DCDB system for reliable power distribution
  • Robust JSW structural support for industrial environment

The SolarPay team delivered an outstanding industrial solar installation that perfectly meets our steel manufacturing energy requirements. The system's reliability and the additional safety features like lightning protection and walkways give us complete confidence in our investment.

Maa Gayatri Steel Management

Operations Director

Ready to Start Your Solar Project?

Get a custom quote for your solar installation. Our team of experts will help you design the perfect solar solution for your needs.

Get Free Consultation

Related Projects

45 KW Solar Plant - Raymond Shop - Raymond Shop, Near Beed Police Station, Beed, Maharashtra, India
Commercial
Featured

45 KW Solar Plant - Raymond Shop

Location: Raymond Shop, Near Beed Police Station, Beed, Maharashtra, India

Capacity: 45 kW

View Project →
3 KW Solar Plant - Mubarik Sardar Khan - Pakiza Green, Indore, Madhya Pradesh, India
Residential
Featured

3 KW Solar Plant - Mubarik Sardar Khan

Location: Pakiza Green, Indore, Madhya Pradesh, India

Capacity: 3 kW

View Project →
5HP Ecozen Solar Pump - Khandwa, Madhya Pradesh, India
Agricultural

5HP Ecozen Solar Pump

Location: Khandwa, Madhya Pradesh, India

Capacity: 5 HP

View Project →